New challenge ahead!
LS Heavylift was awarded a contract for transportation and installation of Furnaces and Valve Structures for Azerikimiya plant, within Azerikimiya EP-300 Revamp project conducted by TechnipFMC and Azfen JV. This will be record-breaking move for the region since furnaces have weight of 1500t and height of 45m. All the equipment necessary for the operation, which comprises of new generation modular hydraulic axle lines and SPMTs is already mobilized to project site location in Sumgait and our team will start this challenging transport soon.
Share